Cabell Huntington Hospital

Cabell Huntington Hospital exterior

6-Story, 180,000 sq. ft. bed tower and emergency facility.  HVAC scope included the installation of (4) air handling units, (2) combustion air handling units, (2) 500 HP steam boilers, (2) chillers, (3) cooling towers, (320) VAV boxes with reheat coils, supply, return and exhaust fan system, (7) hydronic pumps, (12) split AC units, (2) generators, and day tanks.  We installed a complete chilled water system, heating hot water system, condensate, fuel oil and refrigeration piping system.

Plumbing scope included the installation of (743) plumbing fixtures, (122) patient toilet rooms, (3) operating rooms, (3) steam hot water tanks, medical gas, air compressor, domestic water, waste, vent, storm and medical gas piping systems.

Cabell Huntington Hospital mechanical contracting rough waste work
Cabell Huntington Hospital mechanical contracting work
Cabell Huntington Hospital mechanical contracting boiler plant
Cabell Huntington Hospital pumps
Cabell Huntington Hospital exterior rooftop