24-Story, 620,000 sq. ft. federal courthouse and office building facility. HVAC scope was installation of (39) air handling units, (728) VAV boxes, chilled water, steam, condensate, generator exhaust, and fuel oil piping systems.
Plumbing scope was the installation of (420) plumbing fixtures, (4) domestic water chillers, booster pumps, hot water tanks, domestic water, sanitary, waste and vent piping.